Completed Projects

Transnet National Multi-Purpose Pipeline (NMPP) – Installation of  Cathodic Protection and AC Mitigation along the 700km length of the 16” and 24” pipeline routes.

Olifants River Water Resources Development Project Phase II – Supply and Installation of Cathodic Protection along the 40km length of the 70” pipeline route.

Metaffin Pipeline Nelspruit, Mbombela Stadium development for the 2010 Soccer World Cup – Cathodic Protection Installation.

Airports Company South Africa (ACSA) – O.R. Tambo International Cathodic Protection for Airside capacity upgrade.

North South Carrier II Water Transfer Project, Botswana – Supply & Installation of Cathodic Protection Works along the 89km length of the 43” pipeline route.

H39 Pipeline – Rand Water, AC Mitigation and Cross bonding facilities installation for the H39 Pipeline for Rand water.

Projects Still In Progress

Vereeniging Pump Station – Rand Water

Supply & installation of multiple impressed current cathodic protection system in Vereeniging pump station.

Umshwati Phase 3 – WK Contruction

Supply & Installation of the permanent Cathodic Protection System for the Umshwathi Regional Bulk Water supply Scheme – Phase 3.2 and 3.3 B Pipeline of 47.50km Length.

TOP